INITIAL SETUP:
Personnel Required
Seaman 88K
OPERATE THE NAVIGATION EQUIPMENT POWER SUPPLY
1.
Move power switch (1) to ON position.
REGULATED LINEAR
DC POWER SUPPLY
OUTPUT
_+
POWER
2A F/B
ON
115VAC
1
1A F/B
115VAC
220VAC
220VAC
2C037-1
2.
Ensure that Precision Lightweight Global Positioning Receiver (PLGR) and NAVTEX receiver are
receiving power.
END OF WORK PACKAGE