Custom Search
 
  
 
TM 5-1940-277-20
TM 1940-20/2
14.
Using 3/4 inch open end wrench install split coupling (4) to secure cable (5).
NOTE
Control rod may be adjusted to slide onto crank
15.
Place scoops in FULL FORWARD position and slide control rod (2) onto crank (3). Using 1/2 inch box wrench rein-
stall self-locking nut (1).
16.
Reinstall portside buoyancy flotation material (refer to paragraph 3-152).
17.
Reinstall aft cockpit (refer to paragraph 3-27).
18.
Check scoop linkage adjustment (refer to paragraph 3-35).
19.
Close hydrojet hatches.
3-75


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business