Custom Search
 
  
 
TM 55-1905-217-34
Figure 4-21. Accumulator, gage, and valve, removal and installation.
c. Disassembly.
(1) Prior to any disassembly work, the nitrogen gas must be bled from the accumulator. Remove cap (11B) and
loosen lock nut until gas escapes.
(2) Remove valve (11, fig. 4-22).
4-33


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business