Custom Search
 
  
 
TM 55-1905-219-14-2
2-35.
SHORE POWER (Cont).
(4) The shore power available indicator (2) should be lit.
(5) The shore power phase sequence indicator (3) labeled ABC should be lit.
CAUTION
If CBA is lit in the shore power phase indicator (3), STOP - the incoming wiring is
reversed. Remove the shore power cable from the source of shore power. Check all
wiring connections. When the ABC lamp is lit proceed.
Shore power and ships generator loads must be parallel before transfer of power source.
(6)
Check that generator #1 and generator #2 main circuit breakers (4 and 5) are in the OFF position.
(7)
Place the shore power circuit breaker (1) in the ON position.
(8)
Place the distribution main circuit breaker (6) in the ON position.
(9)
Place the generator #2/shore power voltmeter switch (7) in the SHORE POWER position.  The generator
#2/shore power voltmeter (8) should read 450V.
(10)Place the generator #2/shore power ammeter switch (9) in the SHORE POWER position.  The generator
#2/shore power ammeter (10) should indicate the amperage drawn.
2-264


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business