Custom Search
 
  
 
TM 55-1905-219-14-2
2-108. AIR CONDITIONING SYSTEM START-UP.
To start the air conditioning system, (Figure FO-58), proceed as follows:
a.
Crew and Transient Berthing.
Place circuit breaker #3 on power distribution panel (P406) in the ON position.
b.
Air Conditioning Compartment (2-28-1-A).
(1)
Rotate condenser outlet flow control valve (1) counter-clockwise.
(2)
Rotate condenser-receiver equalizing line flow control valve (2) counter-clockwise.
(3)
Rotate heat exchanger liquid inlet shutoff valve (3) counter-clockwise.
(4)
Rotate charge and drain valve (4) clockwise.
(5)
Rotate drain valve (5) clockwise.
(6)
Rotate heat exchanger liquid bypass shutoff valve (6) clockwise.
(7)
Rotate dryer bypass valve (7) counter-clockwise.
(8)
Rotate dryer output valve (8) clockwise.
(9)
Rotate dryer input valve (9) clockwise.
(10) Rotate thermal expansion valve (10) counter-clockwise.
(11) Rotate liquid solenoid shutoff valve (11) counter-clockwise.
(12) Rotate thermal expansion shutoff valve (12) counter- clockwise.
(13) Rotate compressor stop suction shutoff valve (13) clockwise.
(14) Rotate hand expansion valve (14) clockwise.
(15) Rotate lube oil gauge valve (15) counter-clockwise.
(16) Rotate compressor suction gauge valve (16) counter-clockwise.
(17) Rotate compressor discharge gauge valve (17) counter-clockwise.
2-468


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business