Custom Search
 
  
 
TM 55-1905-219-14-2
2-165. STERN GATE DAVITS.
To remove and store the stern gate davits, proceed as follows
This procedure requires four men to support and lift the davits.
a.
Loosen dog bolt (1).
b.
Support davit (2).
c.
Swing clamp (3) open.
d.
Lift davit from base (4).
e.
Move davit (2) to port side.
f.
Remove dog bolt handle (5).
g.
Remove stowage bracket (6).
h.
Place davit on bracket (7).
I.
Replace stowage bracket (6).
j.
Replace dog bolt handle (5).
Change 2 2-648


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business