Custom Search
 
  
 
TM 55-1905-219-14-4
3-9.3.
EMERGENCY SHUTDOWN HEAD & LINKAGE - MAINTENANCE INSTRUCTIONS
(Cont).
LOCATION
ITEM
ACTION
REMARKS
Installation (Cont)
b.
Shutdown
Install.
Check that hole
tube (19)
in tube (19)
and tube and
bracket assem-
bly (13) are
aligned.
c.
Guide
Install.
bushing
(18)
d.
Cable
Install.
(20)
e.
Cable
Slide over end of cable.
clamp
(16)
f.
Screw
Insert in cable clamp
Tighten nut
(15),
(16).
(14) finger
and nut
tight.
(14)
g.
Tube
Slide over end of cable.
and
brac-
ket
assem-
bly
(13)
h.
Nut
(10)
Install.
i.
Locking
Install.
pin as-
sembly
(17)
j.
Cap screw
Install tube and bracket
(12) and
assembly (13).
nut (11)
3-394


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business