Custom Search
 
  
 
TM 55-1905-219-14-4
3-54. LINE SHAFTING (PORT SIDE ONLY) - MAINTENANCE INSTRUCTIONS (Continued).
LOCATION
ITEM
ACTION
REMARKS
INSTALLATION
11. Aft
Bulk-
Install bulkhead plate
Hold into place
engine
head
insert (45) onto bulk-
until bulkhead
room,
plate
head.
stuffing box is
port side
insert
bolted to the
bulkhead and
plate insert.
12. Forward
Bulk-
1. Install seal gasket (46).
engine
head
room,
stuff-
2. Install bulkhead stuf-
port side
ing
fing box (44) onto the
box
bulkhead.
3. Install lockwashers (43)
and capscrews (42).
13. Aft
Propel-
1. Insert preformed packing
engine
ler line
(39) into gland stuffing
room,
shaft
box (29).
port side
2. Slide gland stuffing box
(29) on line propeller
shaft (34).
3. Slide propeller line
Use chain
shaft (34) through
bulkhead plate insert
(45), seal gasket (46)
and bulkhead stuffing
box (44).
3-991


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business