Custom Search
 
  
 
TM 55-1905-219-14-5
3-65.1. EMERGENCY SHUT-DOWN - HEAD AND LINKAGE -MAINTENANCE INSTRUCTIONS
(Cont).
LOCATION
ITEM
ACTION
REMARK
REMOVAL (Cont)
INSTALLATION
4. Emergency
a. Replace-
Install.
Replacement
shut-down
ment
cable is as
cable and
cable
follows: Star-
linkage.
(18)
board Generator
14 feet (4.3
m), Port Gen-
erator 20 feet
(6.1 m). Route
cable from
emergency shut-
down station to en-
gine room.
3-1153


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business