Custom Search
 
  
 
TM 55-1905-220-14-1
Table 2-1. PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) - continued
Location
Item
Item To Check/
Not Mission
No.
Interval
Service
Procedure
Capable If :
NOTE*
51
Continued
It is recommended that new
engines be started with
100-hour oil change
periods. Establishment of
the most practical oil
change period should be
based on results of oil
sample analysis.
52
HOURLY
Engine Room
GENERATOR ENGINE.
*Hourly usage
exceeds 250
ENGINE OIL CHANGE. Pump
and/or when
engine oil into a suitable container
oil sample
through dipstick hole (10).
analysis
indicates need
NOTE*
for action.
It is recommended that new
engines be started with
100-hour oil change
periods. Establishment of
the most practical oil
change period should be
based on results of oil
sample analysis.
NOTE
Do not drain oil into bilges.
Use the oil/water separa-
tion system to collect
drained oil.
NOTE
Use rotary hand dispensing
pump NSN 4930-00-263-
9880.
Change 5
2-127


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business