Custom Search
 
  
 
TM 55-1905-220-14-10
5-8. BLOWER - MAINTENANCE INSTRUCTIONS (Continued).
LOCATION
ITEM
ACTION
REMARKS
OVERHAUL - DISASSEMBLY (Cont)
2. Back out the center
screws of both pullers
and place the flanges
against the gear faces,
aligning the flange
holes with the tapped
holes in the gears.
Secure the pullers to
the gears with 5/16"-
24 X 1-1/2" bolts
(two bolts on the L.H.
helix gear and three
bolts on the R.H. helix gear).
3. With a clean cloth
placed between the
rotors to prevent their
turning, turn the two
puller screws uniformly
clockwise and withdraw
the gears from the rotor
shafts as shown below.
5-227


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business