Custom Search
 
  
 
TM 55-1905-220-14-11
6-1.
PROPELLER SHAFT AND BEARINGS - MAINTENANCE INSTRUCTIONS
(Continued).
This task covers:
a.
Inspection
c.
Installation
b.
Removal
d.
Adjustment
INITIAL SETUP
Test Equipment
References
Paragraph
Chain hoists 850 lb min.
Welding and cutting torch
3-54
Line Shaft (Port Side)
Operators Maintenance
Instructions
FO-16
Drydock Plan
Equipment
Special Tools
Condition
Condition Description
Lifting pad eyes (3 each)
NONE
Lockwire
Tallow
Material/Parts
Special Environmental Conditions
NONE
NONE
Personnel Required
General Safety Instructions
10
NONE
LOCATION
ITEM
ACTION
REMARKS
INSPECTION
a. Coupling
1. Check for cracks.
and
half
Shaft
2. Check nuts and
Make sure they
bolts.
are tight.
3. Check cotter pins
for wear or breaks.
4. Check for wear.
6-5


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business