2-37. PRELIMINARY ADJUSTMENTS.
Prior to starting either generator, the following steps must be performed.
a. Place generator #1 circuit breaker (1) in the OFF position.
b. Place generator #2 circuit breaker (2) in the OFF position.
c. Place the manual voltage adjustment (3) for generator #1 in the FULL counter-clockwise position.
d. Place the manual voltage adjustment (4) for generator #2 in the FULL counter-clockwise position.
e. Place the integral switch (5) for generator #1 in the UNIT position.
f. Place the integral switch (6) for generator #2 in the UNIT position.
g. Place the auto-manual switch (7) for generator #1 in the MAN position.
h. Place the auto-manual switch (8) for generator #2 in the MAN position.
i. Proceed to start a generator locally.