Custom Search
 
  
 
TM 55-1905-220-14-2
2-163. WIND SCREEN AND RAILINGS Cont).
b.
RAILINGS. REMOVAL/INSTALLATION.
(1)
To remove railings, refer to FO-65 and proceed as follows:
(a)
Unsnap hooks (1).
(b)
Remove shackles and chains (2).
(c)
Loosen turn buckles (3).
(d)
Remove shackles (4).
(e)
Remove wire rope (5).
(f)
Remove toggle pins (6) at base of stanchions.
(g)
Remove toggle pins (7) and braces (8).
(h)
Stow stanchions on deck.
(2)
To Install Railings, proceed as follows:
(a)
Install stanchions, proceed as follows:
Stanchion A - five
B - eighteen
C - one
D - one
E - one
F - one
G - one
H - two
I - one
J - four
K - six
(b)
Install toggle pins (6).
NOTE
Hooks on all side stanchions shall point forward and inboard.
(c)
Install braces (8) and toggle pins (7).
(d)
Install wire ropes (4), shackles (4) and turnbuckles (3).
(e)
Install chains and shackles (2).
(f)
Install hooks (1).
2-752


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business