Custom Search
 
  
 
TM 55-1905-220-14-4
3-56. SHAFT SEALS - MAINTENANCE INSTRUCTIONS (Continued).
LOCATION
ITEM
ACTION
REMARKS
INSTALLATION (Cont)
4. Hold sealing element
(26) in shaft for 20
to 30 seconds to allow
the cement to partially
set up.
5. Still holding split
Holes located
sealing element (26)
on O.D. side
and keeping pressed
of the sealing
against the shaft,
element. Use
drive the barbed
finger pressure
staple (22) into
only.
the pre-drilled
lead holes strad-
dling the cemented
joint.
6. The bridge of barbed
staples (22) should
contact the O.D. of
the sealing element
flanges.
7. Still holding the
split surfaces in
alignment, encircle
the sealing element
(26) in the spring
garter recess with
three turns of heavy
cord or twine.
3-1001


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business