Custom Search
 
  
 
TM 55-1905-220-14-8
4-9.2. BILGE PUMP - MAINTENANCE INSTRUCTIONS.
This task covers:
a. Inspection
b. Disassembly
c. Reassembly
INITIAL SETUP
Test Equipment
References
NONE
NONE
Equipment
Special Tools
Condition Condition Description
Paragraph
Screwdrivers, (two) large
4-9.1  Bilge Pump - removal
Material/Parts
Special Environmental Conditions
Emery or crocus cloth -
NONE
fine
Personnel Required
General Safety Instructions
2
Observe WARNING.
LOCATION
ITEM
ACTION
REMARKS
Tag start buttons in both the pilot house and forward engine room.
INSPECTION
1.
Pump
a. Housing
Inspect for breaks,
cracks or leaks.
B. hardware
Inspect for tightness.
c.
Belt drive
Inspect for signs of
damage.
4-479


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business