Custom Search
 
  
 
TM 55-1905-222-14
4-16
REPAIR CONTROL AND DISTRIBUTION PANEL.
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Tools:
Equipment Conditions:
Tool Kit, Mechanic's, Rail
All power off.
and Marine
Material/Parts:
General Safety Instructions:
Fuse, 10 amp
Disconnect all leads from battery
terminals before replacing
Switch,
electrical equipment.
MS-35053-04
REMOVAL
REMOVE FUSE
a.
Remove two nuts (1) from studs.
b.
Remove fuse holder (2) and fuse (3).
INSTALLATION
INSTALL FUSE.
a.
Install fuse (3) and fuse holder (2).
b.
Secure fuse holder (2) with nuts (1).
4-31


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business