Custom Search
 
  
 
TM 55-1905-223-10
(4) Stow shore power cable in overhead rack on stern main deck.
(5) Secure cable connectors with waterproof wrapping.
d. Rigging Gangplank.
NOTE
Several crew members are required to remove GANGPLANK (1, FIGURE 2-
224) from its stowed position on cargo deck, port side.
GANGPLANK GUIDE RAILS (FIGURE 2-224) are located on 01 deck, port (6)
and starboard (4) sides aft, and stern end (5) (starboard).
CAUTION
At least one crew member will apply pressure against GANGPLANK (1) near
center BRACKET (3) to prevent gangplank from tipping after BRACKETS (3) are
removed.
(1) Remove three WING-TYPE NUTS (2, FIGURE 2-224) from holding BRACKETS (3). BRACKETS
(3) are hinged and swing down and away from GANGPLANK (1).
(2) Crew members will lift GANGPLANK (1) up and away from fixed section of BRACKETS (3) and port
gunnel.
(3) Place GANGPLANK (1) down flat with WHEELS (7) on deck.
(4) Lift CONNECTOR END (8) of GANGPLANK (1) to comfortable height and roll GANGPLANK (1) aft
to location of rescue/work boat crane.
NOTE
Gangplank may be carried by several crew members.
(5) Place GANGPLANK (1) down flat with WHEELS (7) on deck and CONNECTOR END (8) facing aft.
(6) Attach appropriate type LIFTING SLING (14) to gangplank.
(7) To operate crane (FIGURE 2-224) perform following:
(a) Remove WATER TIGHT CAP (17) from socket on MOTOR CONTROLLER (19).
(b) Insert POWER CORD (9) into socket of MOTOR CONTROLLER (19).
(c) On MOTOR CONTROLLER (19), set OFF-ON lever to ON position.
(d) Remove REMOTE CONTROL unit (18) from CRADLE (10). Press UP (12) to raise crane
and press DOWN (13) to lower crane.
2-584


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business