TM 55-1905-223-10
Standard: Emergency generator should pick up electrical load within 45 seconds after tupping main generator
off line. Oil pressure 30-60 psi at rated speed, water temperature 180190 F. when warmed up, speed
-
controls and voltage regulation functional in both automatic and manual mode. No leaks in fuel and lube oil,
water and exhaust systems. Lube oil analysis indicates no abnormal results, oil consumption not excessive.
Log book indicates weekly test operation and two hour test run monthly and performance of P/M services listed
above. ________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
c.
Emergency Switchboard:
Condition: Inspect for grounds (w/ground lamps) instrument readings, switch operation, meter calibration, verify
annual cleaning performed.
Standard: No grounds are indicated, instruments are functional and bear calibration sticker from last OCCM
period, switches are functional, no damage present, verify switchboard cleaned within previous 12 months.
NOTE: Calibration of switchboard instruments is normally included as part of the OCCM specifications. ____
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
d.
Fixed Fire Fighting System:
Condition: Inspect and observe pressure in tanks, securements, and releases.
Check vessel records for
accomplishment of annual servicing and 5 year inspection.
Standard: Pressure (adjusted for temperature) in normal range. No damage or corrosion or dislocation in
securements and release mechanism. Check vessel records for accomplishment of annual weight test of
cylinders (CO2) and performance of CFR required 5 year inspection procedures (hydro static cylinders).
NOTE: Complete inspection and servicing of the fixed fire fighting system is normally included in OCCM
specifications: __________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
e.
Supply Fan:
Change 8 G-48


 