Custom Search
 
  
 
TM 55-1905-233-24-10
Table 2-1.
Preventive Maintenance Checks and Services - CONT
D - Daily
M - Monthly
Q - Quarterly
S - Semiannually
A - Annually
B - Biennially
Items To Be
Item
Interval
Procedures
Inspected/Serviced
No.
D
M
QS
A
B
13
Suction Strainer Element -
(5)
Remove hand hold cover from each end of reservoir
CONT
CONT
tank.
(6)
Disconnect suction strainer from suction pipe inside
each end of reservoir tank.
(7)
Remove suction strainer elements from suction strainer.
(8)
Clean elements in approved cleaning solvent
(Item 5, Appendix C).
(9)
Install elements in suction strainers.
(10)
Replace suction strainer elements in suction strainers.
(11)
Connect suction strainer to suction pipe inside each
end of reservoir tank.
(12)
Replace hand hold cover on each end of reservoir tank.
(13)
Replace magnetic drain plug.
(14)
Remove tags from the three control panels and
turn on electric motor in hydraulic power pack assembly.
(15)
Check hydraulic level at hydraulic fluid level indicator.
(16)
If hydraulic fluid level is below th e full level,
slowly add hydraulic fluid to reservoir tank
until full level reading is obtained.
2-13


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business