Custom Search
 
  
 
TM 55-1905-223-24-10
NOTE
When installing new preformed packing, coat lightly with clean system oil.
a.
Install preformed packing (5,7).
b.
Position valve tapping plate (8,9) to line up with lock pins (6).
c.
Position crossport relief valve (4) to line up with lock pins (6).
d.
Place retaining plate seal (3) over crossport re lief valve (4).
e.
Secure modular relief valve (2) to crossport relief valve assembly with four machine bolts (1).
2-40


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business