Custom Search
 
  
 
TM 55-1905-223-24-10
c. Dry all components with compressed air.
ASSEMBLY
a. Prior to reassembly of winch assembly coat all packing with lubricating oil and seals with lubricating grease.
Coat threads of all screws with locktite (see lubrication chart LO 55-1905-223-12).
b. Install cable anchors (3) into winch drum (4). Install inboard end of winch assembly including gear reducer, see
c. At outboard of winch assembly install upright (17) with identification plate seal slee ves (5), seal (6), bearing (15),
shaft retainer (10), hex head capscrews (11) and secure in rotation until snug.
d. On capscrews (11) install lockwire (13), bearing spacer (9); install end cover (14) with lubrication fitting (12),
lockwashers (8), hexhead cap screws (7) and secure in rotation until snug.
e. Install bail (23) with bushing (18) and set collars (19); set side frames (24) and install dowels (22), lockwashers
(21), and socket head capscrews (20).
REPLACEMENT
Bow ramp winch is replaced in accordance with procedures in the Equipment Conditions.
4-50


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business