MAINTENANCE OF BOW ANCHOR WINDLASS SUBSYSTEM.
4-10. Replace Bow Anchor Windlass Subsystem. (FIGURES 4-1 and 4-2)
This task covers: a. Removal, b. Repair, c. Assembly.
INITIAL SETUP
Tools
Equipment Condition
Tool kit, general mechanic's,
Windlass shutdown. Refer to
TM 55-1905-223-10.
Tool kit, machinist's measuring,
Electrical power removed from
580-00-278-9919
hydraulic power pack and tagged
Lifting sling, P/N 3375958
"Out of Service."
Work barge crane
Caliper set micrometer outside
0-6 inches, 5210-00-554-7134
Materials/Parts
Fibrous rope P/N MILR17343
Fibrous rope P/N CGS21R5
Gasket P/N D4-0135-0604
Chain stopper P/N 49-9127-0000,
P/N 49-9128-0000
Headless straight pin P/N 65-3776-8070
Towing bridle P/N 43-1334-0000
Bow anchor P/N 49-0830-0000
Detachable link P/N 49-9141-0000,
P/N 49-9141-0100
Swivel P/N 49-9145-0000
Shackle P/N 43-4120-8070
Steel anchor chain P/N 49-9125-0000
Grease, Item 3, Appendix C
Electrical ID tags, Item 7, Appendix C
Sandpaper, Item 8, Appendix C
Solvent, Item 6, Appendix C
OVERVIEW
This procedure includes many difficult tasks with different pieces if heavy equipment. For the bow
anchor you will need the help of a work barge. Be very careful when moving anchor and chain.
Change 1
4-5


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business