Custom Search
 
  
 
TM 55-1905-223-24-15
REPAIR
This item is a candidate for direct exchange with vendor.
ASSEMBLY
a.
Install new reservoir.
(1)
Using a lifting sling, place new reservoir in position.
(2)
Install the bolts and nuts (2, 3) securing the reservoir. Torque to 105 ft-lb.
b.
Replace inspection cover gaskets and inspection cover, paragraph 2-17.
c.
Replace hydraulic power pack assembly onto reservoir, paragraph 2-17.
d.
Fill reservoir, paragraph 2-13.
e.
Connect electrical power, remove tags, and restore windlass to operating condition, paragraph 2-13.
4-40


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business