Check the following pumps and their associated
j. Miscellaneous  Pumps/Motors.
motors for obvious damage, leaks and loose connections:
Fresh water pump
Fresh water booster pump
Auxiliary seawater cooling pump
Fuel oil transfer pumps (2)
Lubricating oil standby pumps (2)
Lubricating oil transfer pumps (2)
Dirty lubricating oil pump
Reduction gear cooling water pumps (2)
Check operation in accordance with TM 55-1905-223-10, Operator's Manual.
Ensure proper operation in
k.  Controls Subsystems.  Check for obvious damage.
accordance with TM 55-1905-223-10, Operator's Manual.
l. Electrical Subsystems.  Visually inspect all wiring runs and connection boxes
for obvious damage, broken wires, stripped insulation or loose connections.
m. Windows/Doors/Hatches. Check dogs, hinges, and locking devices for proper
operation.  Check gaskets for cracks, tears and missing material.  Check condition
of glass.
n. Lashing Gear/Towing/Mooring Equipment.  Visually check for obvious damage.
Check all flush deck and raised bumper sockets for cracks or other damage.
o . Workboat/Liferafts/Davit.  Visually check for secure mounting and any obvious
damage.  Ensure davit and workboat operate in accordance with TM 55-1905-223-10,
Operator's Manual.
Visually inspect for obvious damage and loose
p. Control Centers/Switchboards.
connections.
q . Propellers/Shafts. As far as practical, visually inspect for obvious damage
or misalignment.  During initial operation be alert for excessive vibration or leaks
along the shaft and its connections.
r . Valves/Strainers.  Visually inspect all valves and strainers for secure
connections and proper operation.  Check for leaks under pressure.  Ensure proper
operation in accordance with TM 55-1905-223-10, Operator's Manual.
s. Piping. Check all piping systems for leaks, damage or missing components.
Operate each system in accordance with TM 55-1905-223-10, Operator's Manual.
t. Hull/Ladders/Rails/Foundations. Visually check for obvious damage and
missing components.  Check security of life lines and rails., Check proper storage
of portable ladders and gangways.
Initial Setup Procedure.  Includes operational checks and inspections that are
2-7.
not performed for a routine startup.  Direct support maintenance personnel will
perform initial setup in accordance with the TM 55-1905-223-10, Operator's Manual.
Refer to the TM 55-1905-223-10, Operator's Manual.
Normal Startup.
2-8.
2-3


 