Custom Search
 
  
 
TM 55-1905-223-24-18-1
aa.
Install push switch (21) and two incandescent lamps (20).
ab.
Install dead slow ahead lens (19).
Repeat procedures aa. and ab. for port side dead slow ahead indicator.
ac.
Install push switch (18) and two incandescent lamps (17).
ad.
Install standby lens (16).
ae.
Install push switch (15) and two incandescent lamps (14).
af.
Install slow ahead lens (13).
ag.
Repeat procedures af. and ag. for port side slow ahead indicator.
ah.
Install push switch (12) and two incandescent lamps (11).
ai.
Install finished with engines lens (10).
aj.
Install push switch (9) and two incandescent lamps (8).
ak.
al.
Install half ahead lens (7).
Repeat procedures ak. and al. for port side half ahead indicator.
am.
Install push switch (6) and two incandescent lamps (5).
an.
ao.
Install full ahead lens (4).
Repeat procedures ao. and ap. for port side full ahead indicator.
ap.
Install push switch (3) and two incandescent lamps (2).
aq.
Install bridge control lens (1).
ar.
as.
Repeat procedures aq. and ar. for port side bridge control indicator.
2-544


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business