Custom Search
 
  
 
TM 55-1905-223-24-18-1
a. Replace Rotary Switch.
(1) Install rotary switch (5) through slot in rotary switch cover (1).
(2) Replace cover and secure with four round head screws (2).
(3) Connect electrical leads (6) and remove tags.
(4) Replace cover (8) and secure with four screws (7).
(5) Install lever (3) and secure with round head screws (4).
b. Replace Bush Switch. (FIGURE 2-144)
(1) Install push switch (5) in slot in pilothouse control console (4).
(2) Secure with hex head nut (3).
(3) Install knob (1) on switch and secure set screw (2).
(4) Connect electrical leads and remove tags.
c. Replace Lever Switch. (FIGURE 2-143)
(1) Install lever switch (1) and secure with four capscrews (4).
(2) Remove caps or plug and connect hydraulic lines at connections (2, 3).
d. Replace Transmitter Indicator.
(1) Seat indicator (1) on shaft (6).
(2) Secure indicator to bracket (5) by screwing four hex head nuts (3) onto
mounting studs (4).
(3) Connect electrical cable at connection (2).
e. Replace Terminal Box.
(1) Install terminal box (3) on mounting bracket (6).
(2) Secure terminal box to bracket by screwing four hex head nuts (1) onto
mounting studs (2).
Remove tags.
(3) Connect electrical cables at connections (4, 5, and 7).
f. Replace Level Switch.
(1) Install level switch (4) and secure with hex head nut (3).
(2) Connect electrical cable (1) at connection (2).
2-591


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business