Custom Search
 
  
 
TM 55-1905-223-24-18-1
Repair Engine Room Vent Motor Control Center Power Distribution.
2-166.
a. Removal, b. Replacement.
T h i s task covers:
INITIAL SETUP
Equipment Condition
Tools
Main switchboard ENG ROOM VENTMCC P210
Tool kit, electrician's,
200AT 125AT circuit breaker OFF and
tagged "Out of Service - Do Not
Operate" (TM 55-1905-223-10):
Materials/Parts
Push switch P/N 10250H671
Push switch P/N 10250H4241
Warning tag, Item 1, Appendix C
WARNING
Death, serious injury, or equipment damage
can result from contact with live electrical
c i r c u i t s .  B e f o r e beginning work on this, or
a n y other electrical equipment, turn power
a n d control voltage circuit breakers OFF and
tag "Out of Service - Do Not Operate."
NOTE
R e p a i r of motor control center power
d i s t r i b u t i o n is by replacement of push
s w i t c h e s supplied by the motor control
c e n t e r .  Refer to TM 55-1905-223-10 for
l o c a t i o n of push switches.
Refer to the procedures in paragraph 2-163 to replace push switches.
Change 1
2-610


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business