Custom Search
 
  
 
TM 55-1905-223-24-18-1
Repair at this level of maintenance is by replacement of gasket (3), perforated
gasket (4), or entire assembly.
Install strainer sediment element (4, FIGURE 2-245).
a.
Install asbestos gasket (3) and cover (2).
b.
c. Install hexagon nuts (1) and torque to 75 ft-lb (102 Nm).
NOTE
Two soldiers will be required to replace
sediment strainer basket.
Install sediment strainer basket (3, FIGURE 2-244) and attach with bolts (1).
a.
Install nuts (2) and torque to 75 ft-lb (102 Nm).
b.
Charge pipeline and check for leaks.
c.
d.
Remove drip pan.
2-948


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business