Custom Search
 
  
 
TM 55-1905-223-24-18-2
b.
Install thermostat (5) mounting screw, remove tags, and connect electrical leads.
c.
Sweat on liquid sight indicator (2) refrigerate connections.
d.
Sweat on filter dryer (1) refrigerant connections.
e.
Install overload (4) with retaining screw, remove tags, and connect electrical leads.
f.
Install relay (7) with retaining screw, remove tags, and connect electrical leads.
g.
Install electrolytic fixed capacitor (3) in mount and connect electrical quick disconnect leads.
h.
Snap on axial fan impeller (10) on condenser fan motor (a) shaft.
i.
To install condenser fan motor (9), perform the following.
(1)
Install condenser fan motor in condenser unit and install mounting bolts.
(2)
Connect condenser fan motor electrical plug.
j.
To install compressor (8), perform the following:
CAUTION
Handle with care. This unit is heavy and
awkward to handle.
(1)
Install compressor on base.
(2)
Install compressor mounting bolts.
(3)
Remove tags and connect electrical lines.
(4)
Sweat on suction and discharge refrigerant lines.
k.
Refer to paragraph 2-71 .
3-312


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business