Custom Search
 
  
 
TM 55-1905-223-24-18-2
4-14. Repair Vertical Gear Assembly. (Figure 4-3)
This task covers:
a. Disassembly
b. Repair
c. Assembly
INITIAL SETUP :
Tools
Equipment Condition
Tool kit, general mechanic's,
Vertical gear removed as specified in
Materials/Parts
Preformed packing P/N 0007-1988-750
Bushing P/N 0008-2533-000
Grooved ball bearing P/N 0011-6205-110
Worm spindle P/N 2125-3420-010
Gasket P/N 0007-2485-750
Cylindrical spring P/N 0006-4271-160
Spherical plain bearing
P/N 0011-8065-000
Annular ball bearing P/N 0011-3203-470
DISASSEMBLY
Refer to removal procedures in paragraph 3-17 .
REPAIR
Repair of vertical gear assembly consists of replacing preformed packing (5), bushing (7), grooved ball
bearing (9), worm spindle (10), gasket (16), cylindrical spring (17), spherical plain bearing (19), annular
ball bearing (12).
ASSEMBLY
Refer to replacement procedures in paragraph 3-17 .
4-12


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business