Custom Search
 
  
 
TM 55-1905-223-24-5
4-14. Repair Power-Takeoff (PTO) Assembly. (SL111 HP2/with non-adjusting clutch.)
This task covers:
a. Disassembly
b. Repair
c. Assembly
INITIAL SETUP:
Equipment Condition
Tools
PTO removed (para. 3-21).
Tool kit, general mechanic's
rail and marine diesel engine,
Engine lifting fixture P/N 3822512
Combination wrench set,
5120-01-046-4979
Dial indicator, 5210-00-277-8840
Torque wrench kit P/N 3377216
Materials/Parts
Internal gear P/N 6931
Annular ball bearing P/N M224
Nonmetallic hose assembly
P/N A1663, M1292A
Helical compression spring
P/N A2709N
Tapered roller bearing
P/N M207
NOTE
o It is necessary to remove the PTO from the engine first,
then the clutch assembly from the clutch shaft in order to
replace worn clutch plates.
o The pilot roller bearing may be replaced without removing
the PTO clutch assembly from the clutch shaft.
o On PTO units which have been disassembled, steps (a)
through (i) of the Assembly Procedures must be
accomplished in order to reach a starting point for
bearing adjustment. For field adjustment of bearing only,
go to assembly step (i) of this procedure.
DISASSEMBLY
(Refer-to FIGURE 4-21 for reference numbers used in this procedure.)
Change 1
4-41


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business