Custom Search
 
  
 
TM 55-1905-223-24-9
b. Dial Indicating Vacuum Gauge.
(1) Install vacuum gauge on inlet filter assembly (1). Ensure that dial indicator is correctly positioned.
(2) Use wrench on nut at back of gauge to secure hand tight.
c. Operate and Test.
(1) Restore power to pumpset.
(2) Check for leaks.
(3) Return pumpset to normal operation (TM 55-1905-223-10).
(4) Remove "Out of Service - Do Not Operate" tag from circuit breaker.
2-41


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business