TM 55-1905-242-14
0053 00
ITEM
INTERV L
A
MAN-
ITEM TO BE
PROCEDURE
EQUIPMENT
NO.
HOUR
CHECKED OR
NOT READY/
SERVICED
AVAILABLE IF:
101
Monthly
0.5
Condensing Units
Remove access plate from pilothouse
Class III raw water
deck. Check condensing units for
leakage noted.
security of mounting and signs of
leakage (raw water or refrigerant).
Clean any debris that has accum-
ulated around condensing units.
102
Monthly
0.2
Remove grille and clean grille and
filter.
LAZARETTE
103
Monthly
2.5
Remove rust from outside of tanks,
then prime and paint as necessary in
accordance with TB 43-01442. Sample
fuel from each fuel tank bottom drain
valve.
ENGINE ROOM
104
Steering System
Monthly
0.2
a. Relief Valve
Inspect valve and connections for leaks. Class III leakage noted.
Monthly
0.2
b. Flow Divider
Inspect valve and connections for leaks. Class III leakage noted.
Monthly
0.3
c. Check Valve
Inspect valve and connections for leaks. Class III leakage noted.
105
Bilge System
Monthly
0.1
Bilge Pump
Tighten mounting hardware as
necessary.
106
Monthly
2.0
Piping, Valves,
Inspect all bilge piping joints, valves,
Class III leakage noted.
Hoses, and
and hose assemblies for leaks. Inspect
Fittings
valves to ensure that they OPEN and
Valves fail to fully OPEN
CLOSE completely with no binding.
and CLOSE.
Monthly
2.0
In each void, check bellmouth strainer
for debris and clean as necessary.
107
Hydraulic Starting
System
Monthly
0.5
Starting Motor
Inspect motors and connections for
Class III leakage noted.
leaks or damage.
Monthly
0.5
Tighten hose connections and
mounting hardware as required.
0053 00-19


 