Custom Search
 
  
 
TM 55-1905-242-14
0056 00
REMOVAL (continued)
2
1
3
1
2
CLEANING
Clean the piping (2) with a wire brush to ensure good sealing of the new hose.
INSTALLATION
1.
If new hose clamps (1) will be installed, slide them over the piping (2).
2.
Cut a new hose (3) to the desired length and slide the hose over the piping (2), ensuring that the hose overlaps the piping
equally on both sides.
3.
Slide hose clamps (1) over the hose (3) and tighten them securely.
4.
Refill the cooling system with a 50/50 mixture of ethylene glycol inhibited antifreeze and fresh water.
5.
Remove the lockouts and tagouts.
6.
Start the engine and allow it to warm up to operating temperature.
7.
Check the engine cooling system for leaks.
8.
If no leaks are detected, secure the engine and recheck the coolant level.
9.
Dispose of used antifreeze in accordance with local regulations.
END OF WORK PACKAGE
0056 00-2


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business