Custom Search
 
  
 
TM 55-1905-242-14
0138 00
REMOVAL (continued)
3.
Label and disconnect the wiring from the wiring terminals (1) at the pump motor (2).
4.
Loosen the two unions (3) and free the piping (4) from the pump (5).
5.
Remove the bolts (6) that secure the raw water pump assembly to its mount.
INSTALLATION
1.
Position the raw water pump assembly on its mount and secure it with the bolts (6).
2.
Connect the piping (4) to the pump (5) with the two unions (3).
3.
Connect the wiring to the wiring terminals (1) at the pump motor (2) using the labels from step 3 of Removal as a guide.
4.
Replace the access cover.
5.
Remove the lockouts and tagouts from the seacock, OPEN the seacock, and check for leaks at the pump (5) and the two
unions (3).
6.
Remove the lockouts and tagouts and check the operation of the system.
END OF WORK PACKAGE
0138 00-2


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business