Custom Search
 
  
 
TM 55-1925-273-10-1
0067 00
GENERAL SERVICE SYSTEM
1.
Align general service system to #1 and #2 fire and general service pump supply by opening valves as follows:
#1 Fire & General Service Pump. AE-29, FM-2, FM.3, FM-6, FM-17, FM-9 and GS-12
#2 Fire & General Service Pump, AE-29, FM-2, FM-3, FM-7, FM-15, FM-9 and GS-12
Individual component supplies and overboards shall be opened as required.
2.
Follow steps 2-4 of firemain instructions to start/stop fire and general service pumps.
3.
Ensure that pressure reducing station is set for 60 PSI.
EMERGENCY BILGE SUCTION
1.
The engine room bilge area is fitted with an emergency bilge suction which is led directly to the suction side of
fire and general service pump No.1 for discharge overboard.
2.
Align system for #1 and general service pump suction by opening valves as follows:
#1 Fire and General Service Pump: FM-4, FM-6, FM-8 and FM-31
3.
Follow steps 2-4 of firemain instructions to start/stop fire and general service pumps.
Placard 27. Fire Main/WDCM/General Service System (Sheet 2 of 2)
0067 00-36


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business