Custom Search
 
  
 
TM 55-1925-273-10-1
0070 00
(2)
In the forward port corner of the engine room, above SSDG 2:
(a) Set the control air dryer switch (figure 9, item 1) to ON.
(b) Monitor the control air dryer gauge (figure 9, item 2) to ensure normal operation. Normal gauge reading is
125 PSI (8.6 bar).
2
1
Figure 9. Control Air Dryer
END OF WORK PACKAGE
0070 00-6


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business