Custom Search
 
  
 
TM 55-1925-273-10-1
OPERATOR'S MANUAL
INLAND AND COASTAL LARGE TUG (LT)
OPERATION UNDER USUAL CONDITIONS
MARINE SANITATION DEVICE
INITIAL SETUP:
Materials/Parts:
References:
Gloves, Chemical and Oil Protective (Item 264,
FM 55-502
Table 3, WP 0163 00, Volume 2)
TM 55-1925-284-14&P
Goggles, Industrial (Item 270, Table 3,
WP 0163 00, Volume 2)
WP 0163 00 (volume 2)
Tag, Danger (Item 174, Table 1, WP 0165 00,
WP 0165 00 (volume 2)
Volume 2)
Equipment Conditions:
Personnel Required:
All ventilation fans operating normally (WP 0082 00).
One Watercraft Engineer, 88L
OPERATION UNDER USUAL CONDITIONS
SYSTEM STARTUP
NOTE
The System Startup procedure is performed after the following: New System Installation,
System Lay Up, System Overhaul, Air Scour and Pump Out of the Media Tank, and Clean-
ing of the Media Tank.
1.
Set to ON the AUX MACH SPACE NO. 1 PWR PNL NO. 4 circuit breaker (figure 1, item 1) at the main switchboard
(figure 1, item 2) in the EOS.
1
3
2
Figure 1. Main Switchboard
2.
Set to ON the MSD DISCHARGE PUMP AND BLOWER. circuit breaker (figure 2, item 1) in 440V power panel No. 4.
0081 00-1


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business