Custom Search
 
  
 
TM 55-1925-273-10-2
OPERATOR'S MANUAL
INLAND AND COASTAL LARGE TUG (LT)
OPERATION UNDER UNUSUAL CONDITIONS
ENGINE ROOM WATER WASHDOWN SYSTEM
INITIAL SETUP:
Personnel Required:
References:
One Crewmember, Any MOS
WP 0109 00 (volume 1)
ACTIVATION PROCEDURES
1.
Evacuate all personnel from the engine room and AMS 1.
2.
CLOSE the watertight doors between the engine room, AMS 1, and AMS 2.
3.
Align fire and general service pump 1 as the online fire pump (WP 0109 00, volume 1).
! CAUTION
FM-17 and/or FM-15 supplies raw water to various shipboard systems including the refrigera-
tion plant, the air conditioning plant, and the water maker. Failure to secure power to these
systems prior to closing the valves will cause damage to the equipment.
4.
CLOSE the following valves:
a.
FM-17, FIRE/G.S. PMP NO. 1 DISCH TO GS (figure 1, item 1)
1
2
Figure 1. Fire and General Service Pump Valves


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business