Custom Search
 
  
 
TM 55-1925-273-10-2
0138 00
Table 1. Preventive Maintenance Checks and Services Chart (continued)
ITEM INTERVAL MAN-
ITEM TO BE
PROCEDURE
EQUIPMENT
NO.
HOUR
CHECKED OR
NOT READY/
SERVICED
AVAILABLE IF:
REDUCTION
20
Before
0.4
Oil Level
Oil level should be between ADD and
Oil level below
FULL. Add oil (OE/HDO-40) as
ADD or above
required.
FULL.
NOTE
This gauge is located inside No. 2
SHAFT BRAKE PANEL. The air
compressor must be online (WP 0070 00,
volume 1) prior to this check.
SHAFT BRAKE
21
Before
0.2
Air Pressure Gauge
Air pressure gauge should read 100 to
125 PSI (6.9 to 8.6 bar).
22
Before
0.5
Shaft Brake
Inspect shaft brake for proper operation.
Brake inoperative
Operation
Engage and disengage the shaft brake at
the shaft brake panel.
Shaft Brake Actuator
No.2
Reduction
ShaftBrakePanel
Gear
Shaft Brake Panel
Dipstick
0138 00-6


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business