Tweet |
Custom Search
|
|
|
||
LUBRICATION ORDER
LO 5-1940-221-12
22 OCTOBER 1984
(Supersedes LO 5-1940-221-12-1 and -2 dated 22 February 1974)
BOAT, BRIDGE ERECTION, INBOARD DIESEL ENGINE, ALUMINUM HULL, 27 FT
LG, (ALUMINUM COMPANY OF AMERICA MODEL HICE-27D) (HIGHWAY
PRODUCTS MODEL HPI-27C MODDED) ; (HIGHWAY PRODUCTS MODEL
HPI-27B MODDED) (MARINETTE MARINE CORP. MODEL A27 MODDED)
NSN 1940-00-417-0526
Reference TM 5-1940-221-12 and Federal Supply Catalog C9100-1L
Total TASK-HR is the tine needed to do all services (on-condition or
Clean parts with dry-cleaning solvent type II (SO-II) and dry before
hard-time) prescribed for a particular interval based on normal
lubricating.
operation.
Authorized level of maintenance symbols, operator/crew (C) and
When operating under adverse conditions or if lubricants become
organizational maintenance (O).
contaminated, change your hard-time interval. You may also extend
A dotted circle indicates a drain below and a dotted arrow indicates
intervals during periods of low activity provided adequate preservation
points of lubrication on both sides of equipment.
is performed.
You can help improve this publication. If you find a mistake or know of a
The on-condition (OC) oil sample interval shall always apply unless
way to improve the procedures, please let us know. Mail your letter or
otherwise directed by the Army Oil Analysis Program (AOAP)
DA Form 2028 (Recommended Changes to Publications and Blank
laboratory. In the event (AOAP) laboratory support is not available,
Forms) to: US Army Troop Support Command, ATTN: AMSTR-MPS,
apply your hard-time interval.
4300 Goodfellow Boulevard, St. Louis, MO 63120-1798. A reply will be
Clean fittings before lubricating. Relubricate after washing or fording.
promptly furnished to you.
TOTAL TASK-HR
TOTAL TASK-HR
INTERVAL
TASK-HR
INTERVAL
TASK-HR
25
0.3
300
2.0
100
0.3
500
0.4
250
0.2
1000
2.0
CARD 1 OF 2
|
||