- PREPOSITIONED WATERCRAFT:
PRESERVATION AND ACTIVATION PROCEDURES
- PREPOSITIONED WATERCRAFT:
PRESERVATION AND ACTIVATION PROCEDURES
- By Order of the Secretary of
the Army:
- PREPOSITIONED WATERCRAFT:
PRESERVATION AND ACTIVATION PROCEDURES
- PREPOSITIONED WATERCRAFT:
PRESERVATION AND ACTIVATION PROCEDURES
- CHAPTER I GENERAL
- REFERENCES:
- CHAPTER II TABULATED DATA
- Landing Craft, Mechanized,
- Crane, Barge, 100-Ton,
Design 264B
- Reverse Osmosis Water
Purification Barge
- Reverse Osmosis Water
Purification Barge - CONTINUED
- CHAPTER III PRESERVATION
REQUIREMENTS
- Engine: Main Propulsion,
Generator, Fire Pumps, and Anchor Winch.
- Reduction Gears
- Tanks:
- Electrical Equipment:
- Valves:
- SPECIFIC PRESERVATION
INSTRUCTIONS:
- Hazardous Material:
- RECORDS
- RECORDS - CONTINUED
- FIG. III-1
- FIG. III-2
- FIG. III-2A
- FIG. III-3
- FIG. III-3A
- FIG. III-3B
- FIG. III-3C
- CHAPTER IV CARE OF SUPPLIES
IN STORAGE (COSIS)
- CHAPTER IV CARE OF SUPPLIES
IN STORAGE (COSIS) - CONTINUED
- CHAPTER IV CARE OF SUPPLIES
IN STORAGE (COSIS) - CONTINUED
- FIGURE IV-1
- FIG IV-2-A
- FIG IV-2-B
- FIG IV-2-C
- FIG IV-2-D
- FIG IV-2-E
- CHAPTER V
DEPRESERVATION/ACTIVATION
- Depreservation:
- Manhour Requirements,
Materiel and Special Equipments:
- Estimated Material for HLPS
Watercraft
- Estimated Material for HLPS
Watercraft -CONTINUED
- Estimated Manhours for SSB
Watercraft
- Estimated Material for SSB
- CHAPTER VI RE PRESERVATION
- APPENDIX A DYNAMIC
DEHUMIDIFICATION INSTRUCTIONS
- PREPARATION:
- DYNAMIC DEHUMIDIFICATION :
- MATERIAL REQUIREMENTS:
- MANHOUR REQUIREMENTS :
- Figure A-1. Design 3006; D/H
Connection
- Figure A-2. Design 3006: Air
Flow
- APPENDIX B DYNAMIC
DEHUMIDIFICATION INSTRUCTIONS
- PREPARATION:
- DYNAMIC DEHUMIDIFICATION:
- DYNAMIC DEHUMIDIFICATION:
CONTINUED
- MATERIAL REQUIREMENTS:
- MANHOUR REQUIREMENTS:
- Figure B-1. LCU 1466 A:
Pickups, Sensing Element and Humindistat-Zone 1
- Figure B-2. LCU 1466 A:
Ducting - Zone 1
- Figure B-3. LCU 1466A;
Pickups, Sensing Element, and Humidistat - Zone 2
- Figure B-4. LCU 1466A;
Ducting - Zone 2
- APPENDIX C DYNAMIC
DEHUMIDIFICATION INSTRUCTIONS FOR LANDING CRAFT, MECHANIZED, 74 FOOT
DESIGN LCM-8, MOD. 1 (ROHR BUILT)
- DYNAMIC DEHUMIDIFICATION:
- MATERIAL REQUIREMENTS:
- MANHOUR REQUIREMENTS:
- Figure C-1. Design LCM - 8,
Mod 1;
- Figure C-2. Design LCM - 8,
Mod 1; Air Flow
- APPENDIX D DYNAMIC
DEHUMIDIFICATION INSTRUCTIONS
- PREPARATION:
- DYNAMIC DEHUMIDIFICATION:
- DYNAMIC DEHUMIDIFICATION:
- MATERIAL REQUIREMENTS
- Figure 1. D/H DUCTING
- Figure D-1. Design 264B; D/H
Ducting
- Figure D-2. Design 264B; Air
Flow
- APPENDIX E DYNAMIC
DEHUMIDIFICATION INSTRUCTIONS
- dentification for each
individual cover will be marked as follows:
- REVERSE OSMOSIS SYSTEM
- Raw Water System Supply for
R.O.
- Product Water Discharge
System
- Air Conditioner and Systems:
- Salvage Pump
- Winches, Anchor -
- Life Rafts
- Drive System/Drums/Gypsy
Heads:
- Boat Work:
- Engine Compartment
- DYNAMIC DEHUMIDIFICATION:
- D/H Readings.
- Electrical Modification
- MATERIAL REQUIREMENTS :
- MANHOUR REQUIREMENTS : The
following listing contains the estimated skills, manhours, and costs
required
- Figure E-1. ROWPU 300WPB
Dehumidification equipment layout.
- Figure E-2. ROWPU 300WPB
Humidistat Sensing Element Placement.
- Figure E-3. Dehumidification
Electrical Modification ROWPU 300 WPB.
- APPENDIX F SURGE TEAM
FUELING SYSTEM
- Figure F-1
- APPENDIX G APPLICATIONS AND
PROCEDURES GOVERNING USE OF DIESEL FUEL STABILIZER ADDITIVE
- HOW TO USE THE STABILIZER
ADDITIVE
- HOW TO USE THE STABILIZER
ADDITIVE - CONTINUED
- HOW TO USE THE STABILIZER
ADDITIVE - CONTINUED
- ORDERING INFORMATION
- The Metric System and
Equivalents
- DISTRIBUTION
- TB-55-1900-231-15
- DISTRIBUTION Contd
- BLANK PAGE
- BLANK PAGE
- RECOMMENDED CHANGE TO
EQUIPMENT TECHNICAL PUBLICATION
|