Tweet |
Custom Search
|
|
|
||
TB 600-1
24.
a.
25.
d.
26.
Leaking valves.
27.
Pop safety valves and rupture discs
28.
Official DA Lubrication Order
29.
a.
To reduce pressure
b.
To control flow
30.
Condensate traps
31.
To remove remaining traces of water vapor from the air stream prior to cooling.
32.
a.
Filtering
b.
Compression
c.
Drying
d.
Cooling
e.
Expanding
33.
Oxygen expansion valve
34.
A temperature difference must exist between the two bodies involved
35.
Conduction
36.
a.
Conduction
b.
c.
37.
The boiling point
38.
To compress gaseous oxygen or nitrogen into gas cylinders connected to a charging manifold.
39.
The high-pressure oxygen filter is becoming clogged
40.
Slowly
41.
To prevent burning out of the reactivation heater
42.
Carbon dioxide snow or water ice is clogging the high pressure air circuit
43.
Thermostatic expansion valve (TEV)
44.
a.
Creates the high pressure required for injection
b.
Meters and Injects the fuel
c.
Atomizes the fuel
d.
Provides a continuous fuel flow for cooling the injector itself.
45.
46.
a.
Ammonium Chloride
b.
Ammonium Hydroxide
47.
Green
48.
Wash with clear water
49.
a.
Clean cotton coveralls
b.
Asbestos gloves
c.
Face shield
SECTION III
INSTRUCTOR'S CHECKLIST FOR
PERFORMANCE AND PROFICIENCY TEST
4.
The purpose of the Performance and
operational and postoperational checks and represents
Proficiency Test is to verify the ability of the personnel
the remaining 60 percent of the testing procedures.
selected for licensing to satisfactorily perform
There are 100 items to be checked during this test. One
proportional, operational and postoperational checks
point will be allowed for each item correctly performed.
and to demonstrate proficiency in operating the
The potential operator should be authorized to use the
generating plant.
pertinent operator's manual during this exercise. The
passing grade is 70 percent.
5.
This test consists of a number of proportional,
Change 3 C-4
|
||