Part III OPERATION (CONT)
*6.
What must the operator do prior to stopping the generator set.
a.
Move the S-1 switch to the OFF position.
b.
Shut the fuel off.
c.
Move the load circuit breaker to the OFF position.
7.
How long must you operate the engine at rated speed before stopping the generator set?
a.
One minute.
b.
Three to five minutes.
c.
One to three minutes.
*8.
After stopping the generator set, what must the operator check prior to restarting the unit?
a.
Oil and fuel levels.
b.
Air cleaner damage.
c.
Service batteries.
Change 3 H-24


 