4.
Place the operate/program switch (4) in the OPERATE position to allow GPS data from the PLGR to be
distributed to J1 - J5 outputs.
5.
Place the operate/program switch (5) in the PROGRAM position to provide a direct programming link between
the PLGR and a data terminal.
6.
Place SW1 (6) in the ON (up) position to supply the GPS signal to the DSC controller. Place the switch in the
OFF (down position) to prevent the GPS signal from being supplied to the DSC controller.
7.
Place SW2 (7) in the ON (up) position to supply the GPS signal to the satellite communications system. Place the
switch in the OFF (down) position to prevent the GPS signal from being supplied to the satellite communications
system.
8.
Place SW2 (8) in the ON (up) position to supply the GPS signal to the DSC VHF/FM transceiver. Place the switch
in the OFF (down) position to prevent the GPS signal from being supplied to the DSC VHF/FM transceiver.
9.
Place SW4 (9) and SW5 (9) in the ON (up) position or OFF (down) position to turn the GPS signal on or off for
equipment to be installed at a later date.
10. Place SW6 (10) in the ON (up) position to allow interface of GPS differential signal data.