Custom Search
 
  
 
0141 00
TM 11-5895-1847-12&P
4.
Loosen (12) nut on positive post (+) and remove positive wire (7).
7
10
11
9
4
8
12
6
1
11
5
3
2
13
2C142-1
5.
Loosen nut (13) on negative post (-) and remove negative wire (6).
6.
Remove four bolts (8), lock washers (9), and flat washers (10) from GMDSS power supply mounting structure
stand-offs (11).
INSTALL GMDSS POWER SUPPLY
1.
Position and align GMDSS power supply (1) to mounting structure stand-offs (11).
2.
Install four bolts (8), lock washers (9), and flat washers (10) through GMDSS power supply (1) and into mounting
structure stand-offs (11). Tighten bolts (8).
3.
Install negative wire (6) on negative post (-) and tighten nut (13).
4.
Install positive wire (7) on positive post (+) and tighten nut (12).
5.
Plug power cord (5) into GMDSS power receptacle.
6.
Plug power cord (3) into power receptacle outlet (4).
END OF WORK PACKAGE
0141 00 2


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business