Tweet |
Custom Search
|
|
|
||
|
||
TM 5-1940-277-20
TM 1940-20/2
Starboard Engine Exhaust Bellows (13) Removal:
8.
Loosen two bellows clamps (14) on starboard engine exhaust bellows.
9.
Loosen hose clamp (15) securing connecting pipe (16) to exhaust hose (17).
10.
Loosen clamps (15) and (17) securing bellows (16) to exhaust elbow (14) and exhaust pipe (18).
11.
Remove exhaust elbow (14) from exhaust pipe (10) and bellow (16).
INSTALL:
Port Engine Exhaust Bellows (8) Installation:
1.
Place bellows clamps (11) on replacement bellows (1) and align so that clamp nuts will face toward
engine compartment when bellows is installed.
2.
Install port engine exhaust bellows (1) on exhaust port (12).
3.
Install exhaust elbow (4) into port engine exhaust bellows.
4.
Tighten two bellows clamps (11) on exhaust port engine bellows (8).
5.
Secure exhaust elbow (4) to turbocharger (10) by installing four lockwashers (9) and screws (8).
6.
Install heat shield (7) by installing seven lockwashers (6) and screws (5).
7.
Install raw water intake hose (3) on exhaust elbow (4) and tighten hose clamp (15).
Starboard Engine Exhaust Bellows (16) Installation:
8.
Install bellows clamps (14) on replacement bellows (13) and align so that clamp nuts will face
toward engine compartment when bellows is installed.
9.
Install starboard engine exhaust bellows (13) on exhaust port (18).
10.
Install connecting pipe (16) in starboard engine exhaust bellows (13).
11.
Secure connecting pipe (16) to exhaust hose (17) by tightening hose clamp (15).
12.
Tighten two bellows clamps (14) on starboard engine exhaust bellows.
3-146
|
||