Tweet |
Custom Search
|
|
|
||
TM 5-1940-277-20
TM 1940-20/2
INSTALL:
Connect cable to battery post last. Severe burns or shock may result
Install cable end and nut (1) to terminal(s) of master switch.
1.
Install cable end, washer(s) (3) and nut(s) (2) to terminal(s) of starter.
2.
Install cable end, washer(s) (5) and nut(s) (4) to terminal(s) of emergency link solenoid.
3.
4.
Install cable end, washer(s) (7) and nut(s) (6) to terminal(s) of slave receptacle.
Replace wire ties.
5.
Install cable terminal on battery post and tighten with 10 mm box wrench.
6.
7.
Cover battery post and terminals with grease.
Spray nuts and terminals with insulating plastic paint.
8.
Replace battery box cover and secure with strap.
9.
Close all hatches.
10.
3-197
|
||