Custom Search
 
  
 
TM 5-2010-205-14
Section II. SERVICE UPON RECEIPT
4-4. UNPACKING.
a. Remove all metal bands, crating, and plastic sheeting.
b. Remove plastic sheeting.
c. Use solvent (Appendix E item 1) to remove all traces of rust prevention compounds, and all traces of masking
tape.
4-5. CHECKING UNPACKED EQUIPMENT.
a. Inspect the equipment for damage incurred during shipment. If the equipment has been damaged, report the
damage on DD Form 6, Packing Improvement Report.
b. Check the equipment against the packing slip to see if the shipment is complete. Report all discrepancies in
accordance with the instructions of DA PAM 738-750 (TAMNS).
c. Check to see whether the equipment has been modified.
4-6. PRELIMINARY SERVICING.
a. Check the crankcase for lubricating oil (Appendix E, item 2).
b. Check the cooling system for fresh water and antifreeze (Appendix E, item 4).
c. Check the hydraulic reservoir for hydraulic oil (Appendix E, item 21).
d. Remove the fuel filter and fuel strainer. Fill both shells with fuel oil and reinstall the fuel filter and fuel strainer.
e. Start the engine and perform a tune-upper Section VI of this chapter.
4-2


 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business